Overview — Faisal Hills in 2026
Faisal Hills Islamabad crossed a significant threshold in 2025 and 2026: the transition from a developing project into a partially habitable, active community. Executive Block is effectively complete — families are living there, businesses are operating, and two major commercial landmark projects are now under construction. Other blocks are at various stages, with Blocks A and B firmly in the possession-and-construction phase and Blocks C, D, and Prime continuing their development trajectory.
This update covers the latest block-by-block development status, the two major commercial projects, possession availability, price trends, and what to expect in the second half of 2026.
Block-by-block development status
Executive Block — 90% developed, fully habitable
Executive Block is Faisal Hills' showpiece. By 2026:
- Approximately 90% of the block is developed
- Internal roads, boundary walls, and street lighting are in place throughout
- WAPDA electricity connections are live on the majority of streets
- Multiple completed homes are occupied by residents
- Roots International School — one of Pakistan's top school chains — is operating within the block
- Retail and service businesses are active on the main boulevard
- Two landmark commercial projects (Hill Walk Downtown and Faisal Jewel) are under active construction — see below
Block A — mature, active construction phase
Block A was one of the first developed sections of Faisal Hills. In 2026 it is firmly in its construction phase — the infrastructure is in place and residential development is concentrated and active. A large proportion of plots have possession, roads are complete, and homes at various stages of construction are visible throughout. Block A is the closest equivalent to Executive Block in terms of development maturity while being priced somewhat lower.
Block B — possession active, rapid construction growth
Block B has accelerated significantly in 2025–2026. Main roads and internal street networks are functional. Land leveling is complete throughout the block. Possession is being granted actively as streets reach completion standards. The block is exhibiting the same growth curve Block A showed 3–4 years ago — buyers who purchased files earlier are now receiving possession and beginning construction.
Block D — possession granted, homes occupied
Block D reached a possession milestone earlier than many expected. Significant portions of Block D now have possession granted, multiple homes are complete and occupied, and construction activity is growing rapidly. Block D's progress has been cited as a positive signal for the scheme's overall execution record.
Block C — developing, infrastructure in place
Block C has its plots demarcated, main roads built, and boundary walls completed. Residential construction density is still low relative to the earlier blocks, but the foundation for growth is in place. Possession is available on some streets — verify with management for the specific street before purchasing. Block C remains a popular choice for investors targeting a 3–5 year appreciation play.
Prime Block — early investment stage
Prime Block is the newest section of Faisal Hills and remains at the early investment stage. Basic infrastructure (boundary walls, access roads) is in place, but plots are predominantly file-stage. Price entry points are the lowest in the scheme. Buyers here are typically targeting a 5–10 year investment horizon.

Hill Walk Downtown — NOC approved, construction underway
Hill Walk Downtown is the most talked-about commercial development within Faisal Hills in 2026. Planned as the scheme's largest commercial hub — a European-inspired commercial downtown — it represents a qualitative step change in what Faisal Hills offers beyond residential plots.
Key milestones as of mid-2026:
- February 2026 — Official NOC granted, confirming legal status as an approved commercial development. This removed the primary investment risk for the project.
- Construction underway by third-party specialist developers (not in-house by Faisal Hills)
- Possession expected within approximately 2 years from the NOC date
- Positioned to serve the entire Faisal Hills community, plus the wider Taxila–Rawalpindi corridor given its GT Road accessibility
The commercial activity that follows Hill Walk Downtown's opening is expected to further support property values across Executive Block and adjacent residential sections.
Faisal Jewel — construction milestone reached
Faisal Jewel — a 33-floor mixed-use tower comprising a 5-star hotel, residential apartments, and commercial space — has cleared a critical construction milestone in 2026.
- Basement levels — All three basement parking levels and the lower ground floor are 100% structurally complete.
- 2026 target — Rapid upward construction of the residential and commercial tower floors. The project is now in its vertical rise phase.
- Significance — On completion, Faisal Jewel will be one of the tallest buildings in the Rawalpindi–Islamabad corridor, giving Faisal Hills an iconic skyline landmark comparable to what major Islamabad schemes have at their centres.
Price trends — Q1–Q2 2026
Property prices across Faisal Hills have shown the following trends in early 2026:
- Executive Block — Steady appreciation, driven by possession availability and commercial activity. Prices are the highest in the scheme and remain firm with limited negotiating room.
- Block A and Block B — Healthy activity from end-users receiving possession and purchasing plots for immediate construction. Price growth is moderate and underpinned by real demand rather than speculation.
- Block C and Prime Block — Investor-driven activity with higher price volatility. Upside potential is higher but so is the holding period risk.
For live, up-to-date pricing, browse the Faisal Hills plot prices page or the interactive map where dealer-listed prices are updated in real time.
What to expect in H2 2026
Based on the current trajectory, the second half of 2026 is likely to see:
- Continued expansion of possession-ready plots in Blocks B and D as development spreads across more streets
- Visible upward construction on Faisal Jewel — a confidence signal for the wider scheme
- Increased residential construction density in Block A and the developed parts of Block C
- Growing commercial activity in Executive Block as Hill Walk Downtown construction progresses visibly
- Potential for more blocks or sectors to announce possession, which typically triggers a price step-up in the weeks surrounding the announcement
Use the Faisal Hills Map to track available listings in real time and contact verified dealers via WhatsApp — no agents, no commission fees.
Frequently asked questions
- Is Faisal Hills fully developed in 2026?
- No — Faisal Hills is a large scheme and development progress varies significantly by block. Executive Block is approximately 90% developed and largely habitable. Blocks A, B, and D are actively developed with possession available. Blocks C and Prime Block are at earlier stages with basic infrastructure in place but residential construction still growing. The scheme is transitioning from a developing project into a partially occupied community.
- Which Faisal Hills block is most developed in 2026?
- Executive Block is the most developed, with completed roads, active utilities, occupied homes, operational schools and businesses, and two landmark commercial projects (Hill Walk Downtown and Faisal Jewel) under construction. Block A follows closely as the second most developed section.
- What is Hill Walk Downtown and when will it open?
- Hill Walk Downtown is a European-style commercial hub being developed within Faisal Hills Executive Block — designed to be the largest commercial centre in the scheme. It received its official NOC in February 2026 and is expected to be delivered within approximately 2 years. It is being developed under Faisal Hills supervision by third-party specialists.
- What is the latest on Faisal Jewel construction?
- Faisal Jewel is a 33-floor mixed-use tower in Executive Block comprising a 5-star hotel, residential apartments, and commercial space. As of early 2026, the lower ground and three basement parking levels are 100% complete. Upward construction is underway, with the goal of rapid vertical progress through 2026.
- Have plot prices increased in Faisal Hills in 2026?
- Prices in the more developed blocks — Executive Block, Block A, and Block B — have shown steady appreciation, driven by growing possession availability and active construction. Blocks C, D, and Prime Block have seen investor-driven appreciation as the scheme's overall maturity improves. Market conditions in the broader Rawalpindi–Islamabad corridor continue to support property prices. Always check live listings on the map for current rates rather than relying on historical figures.
- Is Faisal Hills NOC status resolved in 2026?
- The Rawalpindi Development Authority (RDA) granted NOC to Faisal Hills for approximately 11,823 kanals of land. Individual blocks have separate NOC statuses — Block A and Block B hold approved NOCs. Buyers should verify the specific NOC status for their chosen block and plot number with the RDA or Faisal Hills management office before purchasing, as approvals can vary by phase and sector.
Live map & listings
Ready to find your plot on the map?
Use the interactive Faisal Hills map to browse all available plots with prices, filter by block and size, and contact dealers directly on WhatsApp — no agents, no extra fees.
Related guides
Faisal Hills Executive Block guide
Full details on Hill Walk Downtown, Faisal Jewel, and prices.
Possession guide — which blocks have possession
Block-by-block possession availability and how to take possession.
Is Faisal Hills a good investment in 2026?
Price trends, ROI analysis, and block-by-block risk.
All blocks guide — A, B, C, D, Executive, Prime